The Stockton Youth Soccer Association (SYSA) Soccer Complex project site serves a dual purpose as both a recreational park, and as a detention basin for the San Joaquin Area Flood Control Agency. The project improvements include eight soccer fields, landscaping, irrigation, site lighting, parking areas, utility infrastructure, concession/restroom building and miscellaneous site improvements. Kjeldsen, Sinnock & Neudeck, Inc. was the civil engineering sub-consultant on the Callander & Associates design team, and provided all surveying, mapping, civil engineering and construction support for the project. The scope of the civil site improvements included site demolition, grading, paving, drainage, domestic water service, irrigation water service, curb, gutter, sidewalk, sanitary sewer service, utility crossings of the Woodbridge Irrigation District canals and miscellaneous site appurtenances