KSN has an excellent rapport with the engineering departments of the local utilities and public agencies, and is well respected both locally, and in Sacramento, for its ability to work through difficult regulatory issues with the various State and Federal permitting agencies, including the US Army Corps of Engineers, the National Marine Fisheries Service, the Central Valley Flood Control Board, the State Water Resources Control Board, the California Department of Public Health, the Federal Emergency Management Agency, and the California Department of Water Resources.
In addition to our private sector clients, KSN currently serves as consultants to over three dozen communities, special districts, and local public agencies in the Central Valley and Sierra Nevada foothills.
The project includes design modifications to four of the existing anaerobic digesters, replacement of the digester gas pipeline and upgrades to the dissolved air flotation thickeners.
KSN prioritized the needs of local levee maintaining agencies in the counties of Butte, Colusa, Glenn, Sutter, Tehama, and Yolo and focused efforts on implementing a regionally coordinated approach to flood emergency response.
KSN contracted with San Joaquin County Office of Emergency Services to provide civil engineering, surveying, and mapping services for the San Joaquin County Flood Contingency Mapping FEMA Pilot Project.
The centerpiece of Stockton’s vision of turning the waterfront area into a destination for recreation, community events, and residential and commercial opportunities.
KSN was retained by Power Engineering Contractors Inc. to provide surveying and mapping services for the emergency replacement of four 36” raw sewage pump discharge pipes at the City of Stockton Regional Wastewater Control Facility.
KSN was retained by Power Engineering Contractors Inc. to provide surveying and mapping services for the emergency replacement of four 36” raw sewage pump discharge pipes at the City of Stockton Regional Wastewater Control Facility.
KSN prioritized the needs of local levee maintaining agencies in the counties of Butte, Colusa, Glenn, Sutter, Tehama, and Yolo and focused efforts on implementing a regionally coordinated approach to flood emergency response.
The project includes design modifications to four of the existing anaerobic digesters, replacement of the digester gas pipeline and upgrades to the dissolved air flotation thickeners.
KSN provided Construction Management Services for the Lower Walnut Creek Restoration Project. The project included construction of new tidal channels, grading of upland areas, endangered species and rare plant monitoring and protections and temporary access bridge construction.
KSN provided Construction Management Services for the Lower Walnut Creek Restoration Project. The project included construction of new tidal channels, grading of upland areas, endangered species and rare plant monitoring and protections and temporary access bridge construction.
KSN provided Construction Management Services for the Lower Walnut Creek Restoration Project. The project included construction of new tidal channels, grading of upland areas, endangered species and rare plant monitoring and protections and temporary access bridge construction.
Airport Way is a major gateway corridor within the City of Stockton and is in need of infrastructure improvements and services to accommodate the continuing growth in the project area.
Seepage through the levee foundation and lower levee slope due to high river flows caused by 2017 high water and winter storms in the Sacramento-San Joaquin Delta region led to a landside levee slope failure on Tyler Island on February 13, 2017.
KSN prioritized the needs of local levee maintaining agencies in the counties of Butte, Colusa, Glenn, Sutter, Tehama, and Yolo and focused efforts on implementing a regionally coordinated approach to flood emergency response.
Designed and constructed 33,000 linear feet of 60-inch diameter reinforced concrete raw water pipeline from Mosher Slough, east of the town of Peters, to the Stockton East Water District (SEWD) Water Treatment Plant Site.
The Spooner Summit Pipeline Project consists of investigation and repair of three segments to the Incline Village General Improvement District’s 20-mile long secondary effluent export pipeline.
2016 – Fourth place nationally out of all firms competing
2015 – Tenth place nationally out of all firms competing
2013 – Eighth place nationally out of all firms competing
2012 – Third place nationally out of all firms competing
2011 – Top 22 Overall Firms to Work For and 15th place nationally out of all firms competing
2010 – Top 20 Overall Firms to Work For and 12th place nationally out of all firms competing (Small Firms ranking limited to Top 3 Small Firms starting in 2010)
2009 – Best Recruiting and Retention Program, 1st place nationally out of all firms competing, Top 10 Small Firms to Work For, and 6th place nationally out of all small firms competing, Top 25 Overall Firms to Work For, 15th place nationally out of all firms competing
2008 – Best Recruiting and Retention Program, 1st place nationally out of all firms competing, Top 10 Small Firms to Work For, 8th place nationally out of all small firms competing, Top 25 Overall Firms to Work For, 11th place nationally out of all firms competing
We at Kjeldsen, Sinnock & Neudeck Inc. pride ourselves on our work and our working relationships. Below are some commendations clients have sent either to us or to others on our behalf.